JTI PHILIPPINES LEAF WAREHOUSE 2018 + EXISTING FACTORY EXTENSION
- DATA FOR LEAF WAREHOUSE ONLY:
- Total area: 50 000 m2
- Supply-exhaust ventilation and air conditioning, air volume 240 000 m3/h,
- Heating 1,0 MW
- Cooling installation 1,4 MW
- Compressed air 2X15kW
WAGO POLAND 2017
- Total area: 22 000 m2
- Supply-exhaust ventilation and air conditioning, air volume 300 000 m3/h,
- Heating 5,2 MW
- Cooling installation 2,4 MW
- Compressed air 5x75 kW + 1x90kW
LANDEWYCK LUXEMBOURG 2017
- Total area: 33 000 m2 Supply-exhaust ventilation and air conditioning, air volume 700 000 m3/h,
- Heating 6,0 MW Steam 2 x 5000 kg/h
- Cooling installation 2,4 MW
- Compressed air 3x160 kW
- Vacuum 3200m3/h
JTI BRAZIL 2017
- Total area: 8 000 m2
- Supply-exhaust ventilation and air conditioning, air volume 180 000 m3/h,
- Heating 1,0 MW heat pumps
- Cooling installation 1,0 MW
- Compressed air 2x37kW + 1x55kW
- Vacuum 1000m3/h
NGK GLIWICE NOX 2016
- Total area: 13 000 m2
- Supply-exhaust ventilation and air conditioning, air volume 100 000 m3/h,
- Heating 1,4 MW
- Cooling installation 1,0 MW
NGK GLIWICE 2014
- Total area: 27 000 m2
- Supply-exhaust ventilation and air conditioning, air volume 350 000 m3/h,
- heating 0,5 MW + AHU’s gas fired
- steam 2x2000 kg/h
- Cooling installation 0,5 MW + VRV systems
JTI PHILIPPINES 2015
- Total area: 60 000 m2
- Supply-exhaust ventilation and air conditioning, air volume 2 300 000 m3/h,
- heating 4,5 MW (steam technology)
- Cooling installation 10,0 MW
- Compressed air 4x160 kW + 1x250kW
- Vacuum 10 000m3/h
JTI POLAND 2014
- Total area: 74 000 m2
- Supply-exhaust ventilation and air conditioning, air volume 2 300 000 m3/h,
- heating 5,2 MW
- Cooling installation 8,0 MW
- Compressed air 3x160 kW + 1x250kW
- Vacuum 8 000m3/h
PILKINGTON SANDOMIERZ 2011
- Total area: 27 000 m2
- Supply-exhaust ventilation and air conditionning, air volume 900 000 m3/h,
- heating 2,6 MW
- Cooling installation 0,5 MW
AQUAPARK WAŁBRZYCH 2009/2010
- Total area: 16 000 m2
- Supply-exhaust ventilation and air conditionning, air volume 250 000 m3/h,
- heating 2,6 MW
- Cooling installation 0,5 MW 120
- sun battery
CARGOTEC – STARGARD SZCZECIŃSKI 2009 (2)
- Total area: 26 000 m2
- Supply-exhaust ventilation and air conditionning, air volume 10 000 m3/h,
- Heating 5MW
- Cooling installation 0,5 MW
HIGH OFFICES BUILDING GTC WROCŁAW 2008
- Total area: 45 000 m2
- Cubic capacity: 150 000 m3
- Supply-exhaust ventilation and air conditionning, air volume 130 000 m3/h,
- Cooling installation 2,0 MW
BOSCH MIRKÓW 2008
- Total area: 11 000 m2
- Cubic capacity: 110 000 m3
- Supply-exhaust ventilation and air conditionning, air volume 250 000 m3/h,
- Cooling capacity 1,2 MW
- Sprinkler installation 800 m3/h
BOSCH ADIF 2007
- Total area: 17 000 m2
- Cubic capacity: 150 000 m3
- Supply-exhaust ventilation and air conditionning, air volume 300 000 m3/h,
- Boiler room capacity 4,2 MW
- Cooling capacity 3 MW
- Fire protect pump station 45 l/s
Sumitomo Toruń 2007
- Total area: 16 000 m2
- Cubic capacity: 112 000 m3
- Supply-exhaust ventilation and air conditionning, air volume 200 000 m3/h,
- Boiler room capacity 3,0 MW
- Steam boiler room capacity 1,0 MW
- Fire protect pump station 45 l/s
Karmann Żary 2006
- Total area: 16 000 m2
- Cubic capacity: 144 000 m3
- Supply-exhaust ventilation and air conditionning, air volume 17 000 m3/h,
- Boiler room capacity 2,0 MW
- Fire protect pump station 45 l/s
Modern Art Center Torun 2006 - Museum
- Total area: 5900 m2
- Cubic capacity: 20000 m3
- Supply-exhaust ventilation and air conditionning, air volume 73 000 m3/h,
- Cooling capacity 0,6 MW
- Heat center capacity 1,3 MW
FUJI SEAL Kutno 2006
- Total area: 43 000 m2
- Cubic capacity: 250 000 m3
- Supply-exhaust ventilation and air conditionning, air volume 500 000 m3/h,
- Cooling capacity: 2,7 MW
- Boiler room capacity: 4,8 MW
- Compressed air installation 78 m3/min
- Vacuum installation 450 m3/h, p = -0,9 bar
Sharp Toruń 2006
- Total area: 43 000 m2
- Cubic capacity: 250 000 m3
- Supply-exhaust ventilation and air conditionning, air volume 500 000 m3/h,
- Cooling capacity: 2,7 MW
- Boiler room capacity: 4,8 MW
- Compressed air installation 78 m3/min
- Vacuum installation 450 m3/h, p = -0,9 bar
Bauer Rotorgravure Printing House Wykroty 2005
- Total area: 70 000 m2
- Cubic capacity: 1 000 000 m3
- Supply-exhaust ventilation and air conditionning, air volume 1 900 000 m3/h,
- Cooling capacity: 13,0 MW
- Boiler room capacity 45,0 MW, smoke stacks 1000, H=52 m
- Rain water storage reservoir V=1000m3, rain water volume 1000 l/s
- Compressed air installation 100 m3/min
- Vacuum installation 0,75 bar
Musical Academy Katowice 2003/2005 – administration and didactical building with concert hall
- Total area: 7300 m2
- Cubic capacity: 38000 m3
- Supply-exhaust ventilation and air conditionning, air volume 120 000 m3/h, precisely regulation of air parameters and high acoustical parameter requirements - 25 dB(A)
- Cooling capacity: 0,6 MW
- Heat center capacity: 1,5 MW